That’s pretty dang impressive. 50 regular double hung windows is usually a long day for me.
Which is funny, because when you think of it, 15 seconds per pane (7.5 per side) comes out to less than 5 hours for 1100 panes. It must be all the other stuff that happens in between. Like WCR & FB breaks
24x20 Windows in and out plus a sunroom. 520 total in and out equals 1040 plus 8 over a door and a sunroom with 32 total. 1080 exactly in 10 hours. Including lunch time and futzin around. It was a long day. Here it is 5:50 heading back out. Lol
First time I ever used DI was on this job about 5 months ago and i didnt know what i was doing. The tds was over 500 and all I had was the Unger hydro power stage 1. I blew through that resin so fast it was terrible. Still got the job done though.
They called me back again for another clean, so today was my first time using my new diy RO/DI cart it was amazing 000 all day long. I love this RO so much!